SIS

Company Profile 2022-2023

We conduct a specific study on your product and select the 3 suppliers that best suit your needs in terms of cost and quality. You can call on us later if you want one of our inspectors to check the status of your production. Time frame: 5 to 7 working days.

We manage the entire production of your product, from the making of the prototype to its final production. Our quality control teams monitor your order all the way to the time of shipping. Manufacturing time frame: It varies depending on your product specification, fabric selection and other process.

We select the best offer among all competitors.

PRICING STRUCTURE

Pre-Production Inspection (PPI)

20-K
  • PER MAN-DAY
  • (MAXIMUM 2 STYLES)

Initial Production Inspection (IPI)

20-K
  • 20 K PER MAN-DAY

During Production Inspection (DPI)

20-K
  • 20 K PER MAN-DAY

Pre-Shipment Inspection (PSI)

20-K
  • PER MAN-DAY
  • (2 Man-days If the sample size is over 200 pcs)

Final Random Inspection (FRI)

25-K
  • PER MAN-DAY
  • (2 Man-days if the sample size is over 200 pcs)

Container Loading and unloading Supervision

18-K
  • PER MAN-DAY

Traveling Cost:

Have any projects

Hire UsOur Experts always ready to work with you.